Step 01
Drop your data
Export from Moraware. Drag your CSVs into the importer. Connect QuickBooks. Point your shop number at us. Day-zero work — under an hour.
CSV from Moraware · QuickBooks Online · Stripe

Calacatta Oro · 3cm · Block 2487
Ghosted builders, stale slabs, dying quotes, remake mistakes — we flag every one the morning it happens, not the quarter after. One platform. No new clipboard.
$50,400/mo
revenue lift from tier optimization alone
$3K–$8K/mo
prevented remakes per shop
95%
of shops currently out of OSHA silica compliance
48 hours
to switch from Moraware — we pay the overlap
You don't buy GladiusStone. You switch to it. Here's exactly how the switch goes — no implementation team, no “quarterly business review.”
Step 01
Export from Moraware. Drag your CSVs into the importer. Connect QuickBooks. Point your shop number at us. Day-zero work — under an hour.
CSV from Moraware · QuickBooks Online · Stripe
Step 02
Every quote, every job, every customer history goes through the seven engines overnight. By morning, intelligence is built — dying deals, cooling builders, stale slabs.
7 engines · nightly · outcomes labeled
Step 03
Open the Morning Brief Tuesday with your coffee. First saved deal usually lands inside week one. We stay on Moraware-overlap until you decide we’re it.
live progress dashboard · we pay your Moraware overlap
Ship Slab Intercept first. Then Tier Whisperer. Remake Radar and Silica Shield in parallel. Every engine runs nightly and labels its own outcomes.
Every quote runs through live nesting math — see your waste % before the customer signs.
Finds every dying quote, every ghosted builder, every slab about to go stale — before it costs you the job.
$14,200/mo
saved deals per shop
Two hours before every showroom visit, GladiusStone writes the Good/Better/Best brief that moves customers up a tier.
$50,400/mo
additional revenue per shop
Seven rules that surface the customers and builders ready for their next conversation — before your competitor gets there.
$180,000/yr
recovered revenue
OSHA 1926.1153 compliance that lives in your product, not a binder. One-tap Cal/OSHA audit export.
Avoid $500K
in fines + stay insurable
Three-layer DXF verification before any CNC cut. Catches the $3,800 sink-cutout error before the saw turns on.
$40K–$100K/yr
in prevented rework
Your master templator retires on Friday. Saturday morning his knowledge is still on every tablet in your shop.
6mo → 6wk
new-hire onboarding
The stone your shop couldn't sell is the slab a shop across town needs. $75 match fee, all profit.
$20K–$60K/yr
recaptured margin
“It's the first software I've bought that found me money on its first weekend. Three dying quotes closed. One builder I didn't know had gone quiet.”
Four screens, four jobs done before 9 AM. This is what shops are paying $710 a month and an eight-tool stack to almost get.
Six-thirty AM, Tuesday. While your shop is dark, GladiusStone has already crawled every quote, every builder, every interaction since Friday. By the time you sit down with coffee, three deals are flagged, one builder is back on the radar, and the actions are already drafted. You don’t plan the day. You confirm it.
Sent every weekday at 6:30 AM. Read it with your coffee.
Daniel Park
$6,336
Calacatta Gold · 48 sqft kitchen
Viewed quote 3× yesterday. No reply in 6 days.
Send the install timeline he asked about — quote stale Friday.
Aisha Brennan
+$1,400
Pental Quartz · 54 sqft kitchen
Template tomorrow. Showroom note: liked Calacatta sample.
Soft tier-up mention — $1,400 ceiling.
Reid Construction LLC
$45K LTV
Builder · last project 47 days ago
No quotes sent in 6 weeks. Permits filed at 12 properties.
Drop by the trailer. They're building, just not with you.
12 more signals · 4 already actioned
Open the brief →Cal/OSHA inspector at the door is no longer a Wednesday-night panic. Every wet-cut reading, every PPE check, every exposure log is captured automatically as your team works. One tap exports a 90-day audit-ready PDF. 95% of shops are non-compliant today. Yours won’t be.
Exposure logs
22 / 22
PPE checks
100%
Wet-cut readings
3 flagged
Marco T. · Bridge saw 1
Half-mask · N100· wet-cut
Marco T. · Edge profiler
Half-mask · N100· wet-cut
Junior R. · Hand polish
Loose face seal flagged
Junior R. · Hand polish
Half-mask refit · OK
Cal/OSHA inspector at the door?
One tap. PDF with 90 days of logs, signed PPE checks, exposure assessments.
+ Inspector Mode: one-click panel for when they're at the door
Every quote runs through deterministic shop math the second a line item lands — cut area, kerf allowance, slab fit, remnant candidates. You see utilization, dollar savings vs. a naive layout, and the exact strip of stone worth saving to the rack. SlabWise built one feature. We built it into every quote on the platform.
Utilization
87.4%
Slab area
71 sqft
1 slab · 120″ × 55″
Cut area
62 sqft
9 sqft waste
Nested savings
$1,956
vs naive 65% layout
Templator pulls into the driveway, snaps a phone photo of the kitchen run, and gets a sectioned starting estimate before they unload the laser. Cabinets and fixtures give scale. Every guess is caveated — no tape measure visible, sink not in frame. It's a head start, not a DXF. SlabWise has one feature like this. We built it into the field tech's daily workflow.
Reading the photo…
46.3 sqft · 2 sections
46.3
sqft estimated
MediumPerimeter L · sink wall
96″ × 25.5″
Island · waterfall edge
80″ × 42″
Return wall · stove side
48″ × 18″
Caveats
~14s · sonnet 4.6 vision
Confirm on job →The thirty-pound piece of Calacatta sitting in your back yard is the exact piece a shop two zip codes over is paying retail for. GladiusStone matches them. $75 fee per match, all profit, photos and dimensions auto-extracted. Nobody else in the category does this — because nobody else has the cross-shop graph.
42″ × 28″
$420
8.2 sqft · listed 3 days
Granite Guild of Tampa
2 nearby shops watching
58″ × 26″
$590
10.5 sqft · listed 1 day
Westshore Stoneworks
Just listed
71″ × 22″
$340
10.8 sqft · listed 6 days
Bayou Slab & Tile
Saved by 3 shops
36″ × 30″
$280
7.5 sqft · listed 2 days
Granite Guild of Tampa
Sold yesterday — restocked
$11,400 recaptured across the Tampa metro this quarter. Stone you would have written off, sold to a shop two ZIPs over.
GladiusPay puts the shop's logo on every checkout. Card, ACH (cheaper for $5K kitchens), or 12-month financing through Wisetack — same surface, your colors. ActionFlow brands theirs. Yours is sharper, and the ACH default on big tickets means real money saved on interchange.
Invoice GS-0000142 · Deposit
$3,168.00
50% deposit · Calacatta Gold · 48 sqft kitchen
Pay with
Card, ACH, or financing — your shop, your branding.
| Stack | Price | Has AI? | Compliance | Marketplace |
|---|---|---|---|---|
| Your current stack (8 tools) | $710–$1,830/mo | No | Binder on a shelf | None |
| Moraware | $100/user/mo | No | None | None |
| Stone Profit Systems | $20K + $500–$1K/mo | No | None | None |
| SlabWise | $199/mo | Nesting only | None | None |
| GladiusStone | $597–$2,997/mo flat | 7 engines · governed | Silica Shield | Cross-shop |
Source: public pricing, Capterra reviews, vendor websites. GladiusStone replaces the eight-tool stack with one flat subscription. No per-user fees. Ever.
Distribution yard? Same platform, different mode. See /distributors →
Moraware charges $100 per user per month. Stone Profit Systems wants $20,000 up front. GladiusStone is one flat number per shop.
$597
per shop, per month · unlimited seats
$1,197
per shop, per month · unlimited seats
$2,997
per shop, per month · unlimited seats

We'll migrate your Moraware data tonight. Your team opens GladiusStone Monday morning and doesn't miss a quote.